Large Hot Tap
|
|
 |
|
Setting up the Hot Tap Machine at the
service center
|
|
 |
|
6" x 6" - Special 3-Way Obstruction Tee
Used at U.C. San Francisco Medical Center
to complete relocation of fire line & hydrant
|
 |
|
Side angle view - All 304 Stainless
Steel
|
|
 |
|
Threaded for completion plug so
temporary hot tap valve can be removed |
 |
|
Mike holding completion plug
|
 |
|
Side view completion plug (see o-ring)
|
 |
|
Cleaning 7.20" OD Ductile fire line
|
 |
|
Stainless Steel bolts for obstruction
tee with anti-seize applied.
Bolts laid out to keep clean so dirt and
sand won't gall the units.
|
 |
|
Obstruction Tee ready for installation
|
|
 |
|
Top half of saddle setting on the pipe
with bottom half ready to bolt on.
|
|
 |
|
Lower duct bank and upper duct bank
|
|
 |
|
Connecting pipe was pushed between
duct
banks so fitting could be aligned.
|
|
 |
|
Connecting to pipe
|
|
 |
|
AWWA "RSW" Resilient Wedge gate valve
|
|
 |
|
Hydro tested machine. Tested to 180psi.
Actual pressure in system 165psi
|
|
 |
|
Valve 6 feet from hot tap connection
|
|
 |
|
Temporary 6" hot tap valve to be removed
from line when the tap is complete.
|
|
 |
|
Hot Tap machine cutter and pilot drill
with coupon retention "catch" wires.
|
|
 |
|
Completion plug setter
|
|
 |
|
Hot Tap machine - Long stroke unit.
|
|
 |
|
Using hydraulics to run the Hot Tap
machine.
|
 |
|
Live Hot Tap is complete.
Setting plug into ID of obstruction
tee
flange so valve can be removed.
Last step will be to install blind
flange onto obstruction tee.
.
Job
Complete!
|